The trail begins near the heart of Spokane and heads slowly uphill to Fish Lake. 4.4 miles in Spokane and 3.75 miles in Cheney near Fish Lake has been paved so far. The middle portion of the trail is gravel, suitable for mountain bikes and hybrids. When completed, the trail will be 14 miles long and will connect to the Columbia Plateau Trail.
|
Picture coming soon
|
Location: Spokane County
City(s): Spokane, WA
|
Length: 10 miles.
|
Popularity: Popular
|
Elevation: Slight climb to Fish Lake
Gain
Loss
|
Facilities |
Trail Condition |
|
Drinking Water:
No
Restrooms:
Yes
Benches:
No
Picnic Tables:
No
|
Surface Type:
Mixed
Surface Quality:
Scenery:
Lighting:
|
Ratings: 0 = none/ the worst
5 = average
10 = excellent
|
|
ALERTS:
|
Effective: 11/9/2009 - 1/1/2030. Paving was completed on another 4.4 miles in Spokane in early November, 2009. Link for additional information
|
Maps: INTC Virtual Tour Rails to Trails article Seattle Times article Spokane Outdoors description Spokane Spokesman article
|
Connections: 1. Connects to the Columbia Plateau Trail at Cheney.
|
Directions: Trail begins at intersection of Government Way and Sunset Boulevard, ends at Fish Lake.
|
|